/
What preparations do manufacturers need to do before dismantling the Industrial Hot Air furnace

News Center

What preparations do manufacturers need to do before dismantling the Industrial Hot Air furnace

  • Categories:Industry News
  • Author:
  • Origin:
  • Time of issue:2022-01-05 10:49
  • Views:

(Summary description)Several things need to be noted before dismantling the Industrial Hot Air furnace. Because there is pressure during use, you must pay attention to relevant tests after removal to avoid leaving safety hazards.

What preparations do manufacturers need to do before dismantling the Industrial Hot Air furnace

(Summary description)Several things need to be noted before dismantling the Industrial Hot Air furnace. Because there is pressure during use, you must pay attention to relevant tests after removal to avoid leaving safety hazards.

  • Categories:Industry News
  • Author:
  • Origin:
  • Time of issue:2022-01-05 10:49
  • Views:
Information

Several things need to be noted before dismantling the Industrial Hot Air furnace. Because there is pressure during use, you must pay attention to relevant tests after removal to avoid leaving safety hazards. The transformation requires the removal of the relevant parts of the existing Industrial Hot Air furnace, so when removing it, please turn off the blower and stop the operation. When the furnace temperature drops to a suitable temperature, stop the induced draft fan and chain grate, and then the workers will set off the fire. The door enters the furnace, the original furnace arch is removed, and the inside of the furnace is cleaned, and then the main engine and auxiliary equipment are removed. So what preparations need to be done before demolition? Please see the explanation in this article.

customized Industrial Hot Air furnace factory
1. Carry out a competition to reduce coal-fired unit consumption and small targets.
2. Control the load of the Industrial Hot Air furnace to avoid coking of the Industrial Hot Air furnace as much as possible.
3. Actively optimize the combustion of Industrial Hot Air furnace to reduce losses.
Fourth, control the quality of water and steam, and reduce the sewage rate of Industrial Hot Air furnace.
5. Adjust the load of the Industrial Hot Air furnace in time.
The above is the preparation work needed to dismantle the Industrial Hot Air furnace, I hope it will be helpful to you.

Keyword:

邦华

Company Name:Banghua International Granulation Engineering Co.,Ltd.
Add: 30th floor, Haixin Tianchen Center B, No.299, Tianchen Road, Gaoxin District, Jinan, China

Tel :86-0531-88876687
Fax :86-0531-88870667
E-mail :
banghua@ca-bh.com  cnbanghua@ca-bh.com

sales@ca-bh.com

COPYRIGHT©2020 Banghua International Granulation Engineering Co.,Ltd   鲁ICP备09011852号   Powered by www.300.cn